HYBRIDShip - Pilot H2020
Image: Fiskerstrand
Vessel information
Project partners: Multimaritime AS, SINTEF, NEL ASA, Hexagon Raufoss ASA, DNV GL, NMA, DSB, Møre og Romsdal Fylke
Project completion date: 2020
Phase 1: Q1/17-Q3/19: Optimisation of a modular and flexible hybrid design, research of maritime use of hydrogen technology, determine the pilot project H2020 Ferry.
Phase2: Q4/19-Q4/20: (Based upon the results of Phase 1), Initial preparations, components, rebuilding of ferry, testing and operating period.
Technical Data
Hydrogen type: (tba)
Hydrogen capacity (kg): (tba)
Storage pressure (bar): (tba)
Fuelcell power (kW): (tba)
Battery capacity (kWh): (tba)
Electric motor power (kW): (tba)
Speed (knots): (tba)
Passengers: (tba)
Cars: (tba)
Trucks: (tba)
Length (m): (tba)
Breadth (m): (tba)